“A Great Stepping Stone”: 24% Resource Increase at Muntanga Project - Atomic Eagle CEO Phil Hoskins

Mining Stock Education19mApril 3, 2026

Get the full intelligence

Search transcripts, export clips, track mentions, and explore all topics from ““A Great Stepping Stone”: 24% Resource Increase at Muntanga Project - Atomic Eagle CEO Phil Hoskins” inside PodZeus.

AI-Generated Summary

In this episode of Mining Stock Education, host Bill Powers interviews Atomic Eagle CEO Phil Hoskins about the company's significant 24% resource increase at the Muntanga Project in Zambia, growing from 47.4 million to 58.8 million pounds of uranium. The expansion was achieved with just $700,000 in drilling, costing only about five cents per pound, highlighting the project's exceptional value and exploration efficiency. Hoskins emphasizes the project’s strong geological potential, with eight high-potential targets identified in Muntanga North and two in Namakande, supported by airborne radiometrics and soil geochemistry. The company uses low-cost gamma-probe drilling for rapid, cost-effective exploration, reserving diamond and RC drilling for later-stage confirmation. A re-released feasibility study, independently reviewed and compliant with both JORC and North American standards, confirms the project’s technical viability, with scale being the key to economic feasibility. The discussion also covers the potential reacquisition of the larger Matawela asset in Niger, which adds significant option value, and the company’s growing visibility in North America and inclusion in major uranium ETFs. The episode closes with a strong cautionary note on the high-risk, high-reward nature of junior mining stocks, stressing discipline, due diligence, and emotional detachment for long-term success.

Key Takeaways
1

Atomic Eagle achieved a 24% resource increase at Muntanga Project with only $700K in drilling, at just 5 cents per pound.

2

Eight high-potential exploration targets have been identified in Muntanga North, with two more in Namakande, all supported by geophysics and soil geochemistry.

3

The company uses low-cost gamma-probe drilling for rapid, efficient exploration, reserving expensive diamond drilling for later confirmation.

4

The feasibility study is independently reviewed and compliant with both JORC and North American standards, with scale being the key to economic viability.

5

The potential reacquisition of the Matawela asset in Niger adds substantial option value, with a 116 million pound resource at high grade.

…and 2 more takeaways available in PodZeus

Chapters
0:00
2 min

Introduction to the Muntanga Project and Resource Growth

We've now been through the wet season and we're a week away from getting the rigs turning again.

Highlight
2:00
3 min

Exploration Strategy and Low-Cost Drilling Approach

Hoskins explains the company’s efficient exploration model using gamma-probe drilling to quickly assess mineralization, avoiding costly diamond drilling on non-productive ground.

5:00
4 min

Target Identification and Geological Potential

There's eight targets within an area called Muntanga North that exhibit all of those characteristics...

Highlight
9:00
5 min

Feasibility Study and Project Economics

If we can increase the scale beyond the 3.5 million ton per annum plant... that's when the economics will become financeable.

Highlight
14:00
6 min

Future Outlook: ETF Inclusion, Asset Reacquisition, and Investor Strategy

The mining sector is a very risky sector. It can take your money very, very quickly.

Highlight
High-Impact Quotes
The mining sector is a very risky sector. It can take your money very, very quickly.
Bill Powers18:07
Viral: 90.0
A good drill hole that converts might cost $50,000 or $100,000 and it might discover something worth a couple billion.
Bill Powers16:40
Viral: 88.0
If we can increase the scale beyond the 3.5 million ton per annum plant... that's when the economics will become financeable.
Phil Hoskins10:00
Viral: 85.0
Speakers

Host

Bill Powers

Guest

Phil Hoskins
Topics Discussed
uranium exploration95%resource growth90%drilling strategy85%feasibility study80%mining project economics75%junior mining stocks70%uranium ETFs65%African mining jurisdiction60%
People & Brands

Atomic Eagle

organization

24xPositive

Phil Hoskins

person

18xPositive

Muntanga Project

other

15xPositive

Bill Powers

person

12xNeutral

Zambia

place

8xPositive

Govix Uranium Inc.

organization

6xNeutral

Matawela

other

5xPositive

Niger

place

5xPositive

JORC

other

4xPositive

NI 43-101

other

3xPositive

Get the full intelligence

Search transcripts, export clips, track mentions, and explore all topics from ““A Great Stepping Stone”: 24% Resource Increase at Muntanga Project - Atomic Eagle CEO Phil Hoskins” inside PodZeus.

Start discovering podcast insights today

Start with a 7-day trial and explore a growing catalog of popular podcasts. No credit card required.

No credit card required • 7-day trial • Cancel anytime